Let’s talk ↗
Cat. 1
Addons / drying

Drying systems for industrial washing lines.

Drying systems - Drying addons remove the hidden bottleneck after the washer: residual moisture, wet labels, pooling corners, and slow manual wipe-down.

1sitemap category
GAdrawing ready
SOPhandover included
Addon scope

What gets solved, supplied, and handed over.

Failure mode

Washed crates or trays are clean, but they still leave the machine wet enough to slow packing, labelling, or stacking.

Scope supplied

Air knives, hot-air tunnels, blower banks, IR boost zones, stainless ducting, exhaust routing, and exit moisture targets.

Handover pack

Exit moisture check sheet, air-flow map, utility load, and commissioning readings.

Project method

From site survey to commissioned addon.

Baseline

Measure current throughput, utilities, floor space, and the failure mode.

Design

Freeze addon sizing, interfaces, controls, and utility routes.

Install

Fabricate, fit, connect, and integrate with the washer and line.

Validate

Run acceptance trials and submit handover records.

Scope calculator

Plan the drying systems scope range.

Use the inputs below for a first engineering scope view before RFQ.

INR 0.0 Lproject scope
INR 0.0 L/yravoidable loss
0 weeksplanning lead time
0 docshandover pack

Use this calculator to compare addon scope sizes before requesting a final quote.

FAQ

Common addon questions.

Can addons be added to an existing Clean Crate machine?

Yes. Most addons can be scoped as a retrofit after checking the machine layout, utilities, controls panel, and available floor space.

Do addons need a separate vendor?

No. The intent of the Addons section is single-vendor accountability for drawings, utility tie-ins, controls, commissioning, and handover.

What information is needed for a quote?

Throughput, container size, current utility availability, plant layout, target compliance standard, and whether the project is new or brownfield.

Is the calculator a final proposal?

No. It is a planning guide. The final proposal scope is confirmed after the engineering review and scope freeze.

Scope drying systems around your actual line.

Send throughput, plant layout, and utility details. We will size the addon around the washer and surrounding process.

Translate this page
Loading languages...

Find your next step.

Search the complete Clean Crate website.