Jerry can wash system for 5-30 L returnable cans across edible oil, agrochem, lubricant, and specialty chemical operations. Single-row inline or two-row stacked configurations. Auto cap-detection upstream, inverted spray heads, drying tunnel option for refill-ready output.
Drag to rotate · explore every element
Front view
Explore the machine elements, separate the parts and watch them come together. Continue below for specifications and application details.
Discuss this machine ↗Illustrative 3D reconstruction from supplied visuals. Final component layout is confirmed for your application.
| Variant | Configuration | Throughput | Typical fit |
|---|---|---|---|
| B6-SR | Single-row inline | 300 cans/hr | Small/mid-volume agrochem, edible oil |
| B6-TR | Two-row stacked | 600 cans/hr | Mid-volume returnable fleet |
| B6-XL | Two-row stacked + drying tunnel | 900 cans/hr | High-volume refill operations |
Use this quick calculator for a first-pass machine scope model. Adjust site tariffs, operating hours, manual baseline, and budget assumptions before sending the RFQ.
This is a planning guide only. Final proposal scope depends on layout, MOC, automation level, utilities, documentation pack, validation needs, and site scope.
Final proposal scope depends on throughput, number of wash zones, heating method, drying, automation, documentation pack, MOC, utilities, and site installation scope.
Yes. Share container dimensions, soil load, peak hourly requirement, available footprint, utilities, and audit requirements so engineering can size the machine.
Use your actual electricity, water, effluent, detergent, steam, labour, and shift data. The calculator defaults are only a first-pass planning baseline.
For configured enquiries, Clean Crate can provide GA drawings, utility schedules, MOC notes, control philosophy, and validation or FAT documents where required.
Share your throughput, vessel format, and plant footprint. You'll get a configured machine, GA drawing, and OPEX report " typically within five working days.
Review the application, trial conditions and measurement questions before preparing an RFQ.