Tunnel washer for returnable dairy and beverage crates. Three throughput tiers " CW-1200, CW-1600, CW-6000 " covering small cooperative dairies through large beverage plants. Pre-rinse, hot detergent zones, rinse, optional sanitise, all in a single continuous pass.
Drag to rotate · explore every element
Front view
Explore the machine elements, separate the parts and watch them come together. Continue below for specifications and application details.
Discuss this machine ↗Illustrative 3D reconstruction from supplied visuals. Final component layout is confirmed for your application.
| Variant | Throughput | Conveyor width | Engineering scope | Typical fit |
|---|---|---|---|---|
| CW-1200 | up to 1,200 crates/hr | 800 mm | Engineering review | Small cooperative dairy, regional beverage |
| CW-1600 | up to 1,600 crates/hr | 1,000 mm | Engineering review | Mid-scale dairy, beverage co-packer |
| CW-6000 | up to 6,000 crates/hr | 1,200 mm | Engineering review | Large dairy, national beverage plant |
Use this quick calculator for a first-pass machine scope model. Adjust site tariffs, operating hours, manual baseline, and budget assumptions before sending the RFQ.
This is a planning guide only. Final proposal scope depends on layout, MOC, automation level, utilities, documentation pack, validation needs, and site scope.
Final proposal scope depends on throughput, number of wash zones, heating method, drying, automation, documentation pack, MOC, utilities, and site installation scope.
Yes. Share container dimensions, soil load, peak hourly requirement, available footprint, utilities, and audit requirements so engineering can size the machine.
Use your actual electricity, water, effluent, detergent, steam, labour, and shift data. The calculator defaults are only a first-pass planning baseline.
For configured enquiries, Clean Crate can provide GA drawings, utility schedules, MOC notes, control philosophy, and validation or FAT documents where required.
Share your throughput, vessel format, and plant footprint. You'll get a configured machine, GA drawing, and OPEX report " typically within five working days.
Review the application, trial conditions and measurement questions before preparing an RFQ.